Brewery Road · Plumstead

Bathroom Renovation in Plumstead

A complete renovation of an outdated bathroom, from new drainage and a rebuilt floor to waterproofing, underfloor heating and the final fittings.

Planning a similar bathroom? Explore our bathroom renovation service and wet room installation.

Designed by Gintaras and his wife, Ieva.
Completed by Cozy Interior.

Finished bathroom with walk-in shower, wall-hung toilet and timber vanity

01 · Before

More than a cosmetic update

This bathroom needed more than a cosmetic update. Multiple leaks, mould and a toilet waste-pipe layout that regularly caused blockages made it increasingly difficult to use. The floor was cold and uneven, the walls and ceiling needed levelling, and inadequate lighting and heating added to an uncomfortable layout. The electrical installation also needed replacing.

The original bathroom layout, vanity and limited circulation space
The original bathroom layout, vanity and limited circulation space
The original toilet area before the pipework and layout were rebuilt
The original toilet area before the pipework and layout were rebuilt
See the original ceiling and door alignment checks
Laser-level check showing the original ceiling and wall alignment
Laser-level check showing the original ceiling and wall alignment
Checking the original door alignment with a spirit level
Checking the original door alignment with a spirit level
Laser-level check showing the original ceiling and wall alignment
Laser-level check showing the original ceiling and wall alignment

02 · Rebuilding

Starting again from the ground up

I stripped out the bathroom completely, removing the existing floor down to the ground beneath it. A new concrete floor was laid, with the falls formed for the shower area.

New pipework replaced the old installation, and a concealed cistern and wall-hung toilet were fitted as part of the revised layout. The electrical installation was renewed, alongside new spotlights, an illuminated mirror and thermostatic controls.

The ceiling was rebuilt with new framing, insulation and plasterboard. The walls were carefully levelled using framing and dot-and-dab boarding where appropriate, keeping the loss of room space to a minimum. The surfaces were then jointed and plastered.

New waste pipework installed beneath the floor
New waste pipework installed beneath the floor
Ceiling framing and insulation before plasterboarding
Ceiling framing and insulation before plasterboarding
Reboarded bathroom with floor preparation and waterproofing work in progress
Reboarded bathroom with floor preparation and waterproofing work in progress
Uncoupling membrane and electric underfloor heating before tiling
Uncoupling membrane and electric underfloor heating before tiling

Waterproofing, warmth and careful finishing

Schlüter waterproofing and an uncoupling membrane were installed, together with electric underfloor heating. The floor was fully tiled, while the walls combined tiled areas with painted finishes.

A bespoke recessed shower niche provided integrated storage. The vanity unit, glass shower screen, heated towel rail, taps and shower fittings completed the installation. Carpentry and decoration, including the bathroom door, were also included.

03 · Finished

A carefully finished bathroom

The finished room brings together pale tiles, timber furniture and chrome fittings, with a new layout, improved heating and lighting, and the essential work beneath the surfaces completed as part of the same renovation.